Tuesday, May 18, 2010

Kitchen is Painted / Trim is in




We painted the kitchen a dark red color now it is time to pick out a back splash. The under cabinet base molding, and window molding is also now installed.
Anyone have any suggestions for a back splash?
We have been doing a lot of outside landscaping, pictures to follow.....

BEFORE PICTURE:


Monday, May 3, 2010

Pictures from up top






I am trying to get HGTV to come and landscape the yard. If anyone has a contact at HGTV let me know... Seriously.





Sunday, April 18, 2010

Faucet is in plumbing is done


Drains:
1) Sink Drain
2) Dish Washer Drain
Water Feeds:
1) Hot water Sink
2) Hot water dishwasher
3) Cold water Sink
4) Cold water ice maker
Faucet is in, soap dispenser is in. Need a back splash and window trim.
Tip :When sweating pipes if you stuff bread in the main feed pipes it will hold the water back and allow you to heat the fittings with out the water drawing the heat away from what you are sweating. Once the fittings are united the bread will flush out.

Friday, April 16, 2010

Granite is Installed





The kitchen is almost done.


To Do List:


Hookup Sink feed

Hookup Sink drain

Hookup Dishwasher

Hookup water feed to fridge

Install back splash

Paint Walls & Ceiling

Paint windows

Install Base Trim

Install Crown Trim

Refinish & Install radiator covers

Wednesday, April 7, 2010

Bathroom Progress

ALMOST AFTER:
A few things left to do in here and the bathroom will be done.


BEFORE:



Monday, April 5, 2010

Doorway enlargement in progress

Needs some trim and the closet door to be installed.


This is what the doorway looked like when we moved in. The new doorway is much larger.




Temporary shade upgraded with better temporary shade

Swapped out the black sheet with the 4$ temporary shade I got from Home Depot.



500 Lbs of Iron :: FOR SALE ::


For scrap or for use.... Needs to be cleaned if used. 220$ or best offer..
See the listing on Craigslist:

23 Tons of Gravel


Rigged this up to help spread the gravel.



This is what 23 Tons of gravel looks like. The plan is to spread this as a base so that the driveway can eventually be paved. The going rate for driveway gravel is $25 / ton delivered.

Front of the house landscaping


Jessie is working on clearning the front so we can put a shrub and flower bed in.



Front steps still need to be fixed.



HOUSE BEFORE PICTURE:

Thursday, April 1, 2010

10 More Yards of Dumpster : From the garage and around the yard...


Will be moving everything left in the garage up to the barn. The floor will be cleaned, coated and sealed with 2 part epoxy floor paint.

Garage is almost empty. Need to sell the tub and 2 sinks. Good Scrap. *FOR SALE*




























Found a really old cargo van type roof by the barn, which is now in the dumpster. The roof had a ton of worms, and really good soil on it and under it.

















Found a lot of miscellaneous items all around.

Wednesday, March 31, 2010

More Appliances New Kitchen Before/After

BEFORE PICTURE:
Work In Progress:


AFTER:




Put in the microwave the oven is hooked up and the cook top is ready as soon as the granite arrives.



Blinds are in : Picture from the kitchen


View from the kitchen.

Blinds are in Living Room Before / After



Put up temporary blinds until the permanent ones are made.
LIVING ROOM BEFORE PIC:

Tuesday, March 30, 2010

3 Main Rooms




Double oven fits perfect in the cabinet. It will be wired tomorrow.



The new TV is mounted on the wall, the wires will be run through the wall and into a floating white wood cabinet.


Trim needed on the doorway between the rooms.


This vanity light will be installed tomorrow.

New GE Cook top stove has arrived


GE Profile cook top has arrived (This is a stock picture) I will be able to install it once the granite is installed.
MODEL # JGP945SEKSS

Sunday, March 28, 2010

Barn to do list
















TO DO LIST:
50 Amps of power 8/3 wire needed
Doors painted trim painted
Floor power wash
Floor paint
Rafters cleared
Outlets wired
Lights wired
Rain barrel install
Drain install
Gutters install
Office built
Bench painted
wall & roof insulation
Wood burning fire place & install

Upper lot


Lots of raking and some grass planting needed.

Brought down the temporary table so we have a place to eat. Kitchen is getting there 2 more weeks and we will be done with this room.
THINGS LEFT TO DO:

Cabinet baseboard trim
Cabinet top trim
Granite countertops
Install Cook top
Install Dish washer
Install drain and water to dish washer
Select Paint Colors
Paint Ceiling
Paint Walls
Install microwave
Hookup water to fridge
Replace 3 kitchen windows
Refinish kitchen door
Install outlets
Install Outlet covers
Crown Molding
Radiator Covers (qty 3)
Radiators painted (qty 3)
Closet Painted
Closet shelf installation
Closet Light installation
Paint & Install Closet Door
Cabinet frame for double oven
Oven installation
Cabinet trim kit for fridge
Paint cellar door
Replace Door knobs & locks (qty 3)
Install chandelier
Replace Storm Door
Trim molding to living room
Ceramic backsplash
Install Sink
Install faucet
Install water feed valves
Install braided water hoses
Install water valve for dish washer
Cabinet door alignment

Before / After Paint



Painted, and switched vanity light wire run.
THINGS LEFT TO DO:

Install door molding
Paint ceiling (2 coats)
Caulk bathtub/shower & door
Caulk sink and vanity
Install vanity light
Purchase & install new window
Purchase & install baseboard cover
Build & finish frame for mirror
Install door stop
Install TP & Towel holder
Switches wired