Wednesday, March 31, 2010

More Appliances New Kitchen Before/After

BEFORE PICTURE:
Work In Progress:


AFTER:




Put in the microwave the oven is hooked up and the cook top is ready as soon as the granite arrives.



Blinds are in : Picture from the kitchen


View from the kitchen.

Blinds are in Living Room Before / After



Put up temporary blinds until the permanent ones are made.
LIVING ROOM BEFORE PIC:

Tuesday, March 30, 2010

3 Main Rooms




Double oven fits perfect in the cabinet. It will be wired tomorrow.



The new TV is mounted on the wall, the wires will be run through the wall and into a floating white wood cabinet.


Trim needed on the doorway between the rooms.


This vanity light will be installed tomorrow.

New GE Cook top stove has arrived


GE Profile cook top has arrived (This is a stock picture) I will be able to install it once the granite is installed.
MODEL # JGP945SEKSS

Sunday, March 28, 2010

Barn to do list
















TO DO LIST:
50 Amps of power 8/3 wire needed
Doors painted trim painted
Floor power wash
Floor paint
Rafters cleared
Outlets wired
Lights wired
Rain barrel install
Drain install
Gutters install
Office built
Bench painted
wall & roof insulation
Wood burning fire place & install

Upper lot


Lots of raking and some grass planting needed.

Brought down the temporary table so we have a place to eat. Kitchen is getting there 2 more weeks and we will be done with this room.
THINGS LEFT TO DO:

Cabinet baseboard trim
Cabinet top trim
Granite countertops
Install Cook top
Install Dish washer
Install drain and water to dish washer
Select Paint Colors
Paint Ceiling
Paint Walls
Install microwave
Hookup water to fridge
Replace 3 kitchen windows
Refinish kitchen door
Install outlets
Install Outlet covers
Crown Molding
Radiator Covers (qty 3)
Radiators painted (qty 3)
Closet Painted
Closet shelf installation
Closet Light installation
Paint & Install Closet Door
Cabinet frame for double oven
Oven installation
Cabinet trim kit for fridge
Paint cellar door
Replace Door knobs & locks (qty 3)
Install chandelier
Replace Storm Door
Trim molding to living room
Ceramic backsplash
Install Sink
Install faucet
Install water feed valves
Install braided water hoses
Install water valve for dish washer
Cabinet door alignment

Before / After Paint



Painted, and switched vanity light wire run.
THINGS LEFT TO DO:

Install door molding
Paint ceiling (2 coats)
Caulk bathtub/shower & door
Caulk sink and vanity
Install vanity light
Purchase & install new window
Purchase & install baseboard cover
Build & finish frame for mirror
Install door stop
Install TP & Towel holder
Switches wired

Monday, March 22, 2010

Stainless Fridge is in... Oven is almost ready


The fridge is in, and the double oven is almost ready, just need to build a frame to support it inside the oven cabinet.

Living Room

Floor needs to be swiffered

Sink is in




Feeds & Drain are hooked up had to put the drank body in twice, always caulk the gasket doing it twice is no fun.

Sunday, March 21, 2010

Couch is in the house


Finally got rid of as much dust as possible and moved in the couch. Need a new coffee table, and some blinds.

Bathroom Vanity Installation




Vanity is up and functioning. Mirror will get a picture frame around it. Still need to do a tile back splash, GFCI outlet, and vanity light.

Outside Pictures

Ruinous fence





This tree grew around an old garage door opener bracket.

Wednesday, March 17, 2010

Kitchen is ready for Appliances




Got a few things left to do with the cabinets, and need to adjust a few of the doors. The refrigerator gets delivered tomorrow, finally we will be able to keep food in the house again.

Sunday, March 14, 2010

Kitchen Cabinets Are Almost Done








































Piz helped/taught me how to put of the cabinets, thanks.

They are almost up, all that is left is:
2 doors
Refrigerator cabinet
Oven cabinet
Trim

Friday, March 12, 2010

Kitchen is Sanded & Primed

Kitchen is primed and ready for cabinet installation. The rest of the cabinets are being delivered today.





Wednesday, March 10, 2010

Property Pictures







Finally the snow is gone. Consider these pictures all before pictures. There is a lot of work to do outside, and a lot of potential.








Truck is fixed




I was at Lowes getting some supplies to work on the house, long story short my truck was hit by another truck in the parking lot. Turns out the guy that hit me owns a body shop and offered to fix the damage he did plus the damage that was there from previous mishaps. He fixed it in 3 days and it looks better than when I bought it.

Tuesday, March 9, 2010

Glass door is installed


Bath is completely finished.

Monday, March 8, 2010

Bathroom is ready for priming






Tomorrow the priming will be done, and ready for the vanity installation.

Kohler Glass Bathtub Door



Bought the Kohler bathtub door. This is the picture from the lowes website. Need a metal blade for the miter saw to cut it to size and install it tomorrow.



Sunday, March 7, 2010

Kitchen & Cabinets



Kitchen needs a little more sanding and priming. Cabinets are here, and ready to be installed.














Bathroom Tile & Walls



Walls are almost ready for primer.

Tile is finished, and sealed.