Friday, February 26, 2010

Saturday, February 20, 2010

Weird Angle is fixed




Fixed the weird doorway angle. Needs some spackle and paint.






Kitchen floor is finished




Monday, February 15, 2010

Sunday, February 14, 2010

Sound Barrier Insulation


Ready for drywall.

Flat Screen Wall Mount & Electric


Supports up to a 55" TV still don't have the TV yet, but the wiring is done.

Saturday, February 13, 2010

Outside of bathroom is sheetrocked


All ready for the door to go in.

New Wall...




Was not planning on replacing this wall.... But decided to anyway.

We Have a Ceiling


Ceiling is up, next the walls.... and then tape and spackle.








Living Room Is Painted...







Wednesday, February 10, 2010

Hallways are now light grey...


Grey walls white doors and white trim.

Winter Views From Each Room



Kitchen & Bathroom





Living Room

Living Room Before & After


Hint: The white one is the before picture

The windows still need to be scraped. Learned my lesson will be taping the rest of the windows.



Tuesday, February 9, 2010

Drain pump installed...




Heavy concrete barn sink is supported by new wood frame. Water is hooked up. Pump is installed to get the water into the grey water system. Turns out the grey water pipes are completely clogged with little hope of clearing. The plan is to patch this into the primary septic system.

Bathroom is almost private...




Started putting up the greenboard. It's almost a private bathroom.

Doors & Trim Painted


Painted the trim & doors going to paint the hallway a light grey tomorrow.




Friday, February 5, 2010

Temporary kitchen / wall boards




Greenboard and Wonderboard ready to be installed in the bathroom (7 of each sheet). The shower nook will be centered and recessed into this wall.
Notice our temporary microwave used for cooking just about every meal.

Passed all Rough Inspections



It is all insulated, fire proofed, and framed. The inspectors came today, and all is good to put up the drywall. The extra insulation is going to be stripped of the vapor barrier and put as a sound damper in the bathroom / kitchen walls.

Sealing off outside wall


The inspector requested that the tub be removed and drywall be brought to the floor. We compromised and built 2x3 boxes into the walls.